Wesco Provided Tailored Assembled Electrical Solution
Overview
Wesco is a global supply chain solutions provider. It worked with a national specialty chain on an Assembled Electrical Solution.
The project reduced the retail chain’s backroom footprint by more than 40%. It also reduced installation time by 30%.
Project challenge
The specialty chain needed to reduce the size of its electrical room while maintaining system integrity.
- Loose panel boards were in a main electrical room.
- An individually mounted time clock controlled lighting contractors.
- Floor-mounted UPS systems were used.
- Checkout, network, and other critical receptacles needed clean power and backup power.
- HVAC controls were on a separate board with contractors completing the system.
Solution
Wesco worked with the retail client and its prime design engineer.
The team used the Assembled Electrical Solution with solenoid-operated smart breakers as a building block.
- HVAC controllers and UPS systems were integrated into the assembly.
- Contractors and interposing relays were eliminated from the lighting control scheme.
- Labor required for installation was reduced.
- A transformer and UPS were integrated into the unit.
- MDP feeder breakers were factory wired before shipment.
- Feeder panel boards were integrated into the assembly.
- Critical components such as the UPS were pre-wired.
- The time clock function came from the system controller.
Results
| Outcome |
Reported change |
| Backroom footprint |
Reduced by more than 40% |
| Installation time |
Reduced by 30% |
Source details
Author: Audree Grubesic
Published: May 31, 2023
Updated: Jul 3, 2024