How Volumetrics Is Making an Impact in Construction

Offsite Dirt published this post on Nov 4, 2020. It was updated on Apr 3.

Key impact

Volumetric construction can reduce on-site waste by up to 90%.

The manufacturing and erection process produces less than 0.6% waste to landfill, compared with traditional construction processes.

What volumetric offsite methods cover

Construction areas affected

Waste reduction figures

Measure Figure
Potential on-site waste reduction Up to 90%
Waste generated in factory-controlled production Less than 1.8% of total weight of materials processed
Waste sent to landfill with recycling measures Less than 0.6%

Principles of offsite construction building techniques

Related topics mentioned